West River Rd. South Restoration
Effective 03.11.2024:
The restoration on West River Rd., S., will begin 03.11.2024. This will be NB between 2nd to just north of W. Bridge St. (just past the overpass). Therefore W. River will be down to one lane as the contractor completes the work.
Approximately 1-2 weeks.