SR 57 Bridge Work
Effective 09.12.2024 6:00 PM:
Road work will be performed on SR 57, just east of W. River Rd. N. (at the bridge) on Thursday, Sept. 12, 2024. The contractor will be setting up signage and traffic control at 6:00 PM. There will be one lane eastbound (57 towards Gulf), and one lane westbound (57 towards W. River Rd. N.) Use caution, and slow down!