Select Page

Effective 08.22.2024 & 08.23.2024:

A contractor will be installing a storm sewer on E. Bridge, by the Railroad bridge, on E. Bridge St. Traffic will be maintained, however there is a possibility of brief delays.

Additionally there will be a catch basin installed in the area of the new traffic island, at the intersection of E. Bridge/Gulf/Cleveland St. Anticipate a shift in traffic pattern.