Clark St. Waterline Repair
Effective 05.21.2024 & 05.22.2024:
Today the Water Distribution crew will be prepping for a watermain repair. During this time, Clark St., between Sumner and Williams will be maintained with temporary traffic lights for one lane of traffic. Tomorrow, the 22nd,
the repair will be made, and the road will open back up to two lanes. Residents will not have water during the repair.